Linz: Asfinag Plans to Convert A7 Hard Shoulder into an Additional Lane to Reduce Congestion
This article was translated from Arabic. Read the Arabic original
Austria Now News – Linz
The Austrian motorway operator Asfinag is working on plans to open the hard shoulder on the A7 (Mühlkreis Autobahn) in Linz to traffic between Knoten Linz and the Bindermichl tunnel in order to ease daily congestion during peak hours. The news was reported by Oberösterreichische Nachrichten (OÖN) and picked up by Heute.
Encouraging Preliminary Studies
The step aims to speed up traffic flow and reduce tailbacks extending all the way to the A1 motorway. Asfinag spokesperson Christoph Pollinger told OÖN that studies conducted so far show that traffic quality in this section can be significantly improved by this measure.
Renovations First Until the End of 2027
The additional lane will not materialize in the near future, as the A7 has been undergoing comprehensive renovation work between Knoten Linz and the Franzosenhausweg exit since April. This includes renewing the road surface, bridges, and noise barriers, as well as widening the hard shoulder. The works are scheduled to be completed by the end of 2027.
Asfinag emphasizes that the current renovation works do not automatically mean the creation of an additional lane. Allowing traffic on the hard shoulder up to the Bindermichl tunnel is planned as an independent project after the renovation is finished. Until then, using the hard shoulder remains prohibited for regular traffic, and unauthorized users face fines of up to 726 euros.
The A7 is one of the busiest roads in Upper Austria, used daily by a large number of commuters traveling between the Mühlviertel region and the city of Linz.
Austria Now News – Keeping you informed at all times.
Photo: User:My Friend / Wikimedia Commons – CC BY-SA 3.0
Sources
- Heute: “Gegen Stau! Pannenstreifen soll zur Fahrspur werden”, 13.11.2026 – Link
- Oberösterreichische Nachrichten (OÖN), via Heute, 13.11.2026